Region moving ahead with bridge replacement on Northfield Drive

Last updated on Dec 04, 25

Posted on Dec 04, 25

3 min read

The long-awaited Scheifele Bridge replacement on Northfield Drive took a step closer after the Region of Waterloo announced it would remove trees this winter ahead of spring construction.

Both lanes of the Conestogo River crossing will continue operating while preparations take place to build a new $24-million span alongside the old one.

However, the region admitted that the project would likely slow journey times between Conestogo village and Waterloo.

; ; ;

Share on

Post In: